Feasibility study 'Steam-Air-Injection' at a site in Switzerland

Duration: 2011-08-01 to 2011-12-31
Department: VEGAS

Feasibility study 'Steam-Air-Injection' at a site in Switzerland

Abstract

Within the framework of a feasibility study the applicability of the In-situ remediation technique of Steam-Air-Injection will be investigated to ensure a safe removal of a CHC contaminated site in Switzerland. Hydraulic and pneumatic aspects, soil-physical behavior are to be determined as well as the settlements of the organic-rich soil matrix (peat) below the building during steam propagation using soil samples from the field site.

Project manager

Koschitzky, Hans-Peter

Deputy

Research assistants

Trötschler, Oliver
Feuring, Tim

Department

VEGAS

Duration

From: 2011-08-01

To: 2011-12-31

Finances

Kellerhals + Haefeli AG,
Amt für Wasser und Abfall, Bern, Schweiz

Cooperation partners

To the top of the page