Feasibility study ISCO at the site 'Biswurm"
- Abstract
-
In order to test the feasibility of the innovative in situ chemical oxidation (ISCO) remediation technology in the deep section of fractured rock at the Biswurm site, a feasibility study was conducted to investigate the principal application in the aquifer of the fractured crystalline sandstone and provide a first indication of the cost estimate of an in-situ remediation with ISCO. For the upper part of the aquifer and the unsaturated zone, the thermal in-situ remediation process by steam-air injection was planned. For this purpose, a feasibility study was also prepared and then a pilot study was also carried out (see sep. projects).
- Project manager
-
Koschitzky, Hans-Peter
- Deputy
-
- Research assistants
-
Trötschler, Oliver
- Department
-
VEGAS
- Duration
-
From: 2008-10-01
To: 2009-05-31
- Finances
-
Stadtbauamt Villingen-Schwenningen
- Cooperation partners
-