Large-Scale Pico Hydro Power Potential Assessment

Laufzeit: 01.03.2010 bis 30.04.2018
Abteilung: LWW

Large-Scale Pico Hydro Power Potential Assessment

Inhalt

Main objective of this dissertation project is to develop a method to determine the qualitative Pico Hydro Power (PHP) potential for any given part of the global land surface.

On a regional scale, it will furthermore be possible to extend the capabilities of the method to obtain quantitative predictions.

Pico Hydro Power with unit sizes of less than five kilowatts is the smallest subdivision of hydroelectric generation technology. PHP units usually supply one to twenty households with electricity and have practically no environmental impact.

Very small streams are used for power extraction by PHP. This causes traditional "on the ground" assessment methods to become un-economical for PHP potential assessments, due to their high fixed costs per investigated site. At present there is no large-scale potential assessment method available for PHP.

The projected method will follow the relatively unconventional path of generating a "local PHP potential probability" from available topographical, hydrological, demographical and various other data.

Leiter

Bearbeiter

Christoph Schröder

Abteilung
Zeitraum

Von: 01.03.2010

Bis: 30.04.2018

Finanzen

BMBF IPSWaT

 

Anfahrt

Pfaffenwaldring 61, 70569 Stuttgart

Zum Seitenanfang